BNM  /  Monitoring  /  Power
UPS, generators & site power

When the power goes, you hear about it first.

Utility drops at the transmitter site, the UPS takes the load, the generator has to start. BNM watches every step — the UPS on line or on battery, AC power and generator status off the site’s remote control — and calls you while the batteries are still holding.

Illustration: utility power fails at a transmitter site. BNM sees AC power lost on the remote control, the UPS go to battery, and calls the on-call list; the generator starts and the UPS returns to line power.

What it reads

Every source of power at the site, on one screen.

UPS

On line or on battery, battery state and the load it’s carrying — for the UPS behind each rack.

PDUs & transfer switches

Power distribution units and transfer switches that answer SNMP, on the same screen as the UPS behind them.

AC power & generator

The site’s remote control reads utility power and generator status on its status channels, so BNM knows when the site is running on the generator.

How BNM reads a remote control

Temperature & humidity

Building, outside and transmitter-exhaust temperatures and humidity, from probes or the remote control’s own channels.

What it raises

Loud when the power fails. Quiet while it holds.

Every condition carries a severity you choose: logged, emailed and texted, or a phone call that walks your call-down list until someone answers.

Can call you

Your choice of which ones

  • The UPS going to battery — and coming back on line
  • AC power or generator status changing on the remote control
  • A temperature outside the range you set
  • A UPS, PDU or remote control that stops answering

Always written down

In the alert feed and the device history

  • When it started, when it cleared and how long it lasted
  • Who was called, who answered, and when it was acknowledged

So the morning after a storm, you can see exactly how long each site ran on battery and on the generator.

Before it fails

The generator gets exercised because BNM said so.

Generator run and load tests, fuel polish, UPS batteries — set the interval once and BNM opens the work order on schedule, assigned to whoever has to do it.

Generator run & load test

Scheduled at the interval you set, tied to the site, closed with notes.

Fuel polish

On the calendar before it’s a problem, not after the generator won’t start.

UPS batteries

Replacement scheduled ahead of end of life, with the work logged against the site.

See work orders
Get started

Know the minute your site goes to battery.

Tell us what feeds your racks. We’ll point a demo at your UPSs and remote controls and wire a test call to your phone.